Home/Guides

How to Negotiate MOQ and FOB Pricing With a Chinese Supplier

MOQ and price are the same conversation. Once you know how the supplier's cost curve works, the negotiation stops being about pressure and starts being about structure.

Why MOQ exists

MOQ is not a sales tactic; it comes from three costs: setup (mould, fixture, packing print), material (some components have their own MOQ from sub-suppliers) and line time (a short run occupies the same slot as a long one).

That is why the same supplier will quote a low MOQ on a stock model and a much higher one on a custom colour.

Ladder pricing, in plain numbers

Most quotes are tiered by quantity. Our robot vacuum ladder, for example: US$165/pc at 200–499 pcs, US$130/pc at 500–999 pcs, US$95/pc from 1,000 pcs. The step from the first tier to the second is the largest single saving available to a buyer.

LeverWhat it savesWhat it costs you
Bigger single orderLower unit priceCapital tied in stock
Mixed models in one orderReaches the tier without one SKU riskSlightly more packing cost
Standard colour / packagingRemoves setup feeLess differentiation
Off-season bookingBetter line slotYou hold stock longer

What to ask for instead of a discount

  • Move the tier, not just the price: "quote me at 500 pcs even if I order 420" is often granted; a flat 20% cut is not.
  • Bundle models to reach the tier: mixed containers are normal for distributors.
  • Trade payment terms for price: a higher deposit sometimes buys a better tier.
  • Ask what the setup fee actually covers, then remove what you do not need (custom gift box, custom manual).

Put it in writing

Fix the quantity, the tier, the Incoterm, the sample reference, the inspection clause and the lead time (our production window is 25–35 days after customisation approval) in one document. Disputes almost always trace back to a term that was agreed verbally and never written.

Our published terms

MOQ ladder200–499 pcs US$165/pc · 500–999 pcs US$130/pc · 1,000+ pcs US$95/pc
Sample5 pcs · 7–14 days
Production25–35 days after customisation approval
Certificates on fileEFW526022843-CG-02+REV 1 · CTA25030700203/+205 · XDX50238736101701EC

Request a quote Sourcing FAQ